• Home
  • Interior Design
    • Services
    • Portfolio
  • About
    • About Us
    • Press
    • Praise
  • Blog
  • Contact Us

Master Bath Renovation Part Two

July 4, 2012 by carole 1 Comment

The master bath renovation part two or as the saga continues.

Generally going well since we’ve made all our picks (tile, fixtures, lights, flooring) and ordered. The contractor generally keeps the job moving along well. Drywall is complete and tile is ready to go. Here’s the current situation, two months post demo, in this installment, master bath renovation part two.

exposed wood area is where new shower will go…half wall will have glass above
arched opening that leads to new den addition
problem child…closet openings on either side of window 

Trying to source my dreamy mirrored closet doors seems next to impossible.

closet idea

Thought we’d found a company who could fabricate 8 foot tall mirrored doors, so we wouldn’t have to do shorter doors with mini-doors on top.  

shorter cabinets on top

So the contractor left the openings to the closets full height to the ceiling, assuming we would fill the space with taller mirrored door or shorter mirrored door with the mini access door on top. Both of those options are a bust, so he has to re-frame the openings and drywall across to accomodate a standard 6’8″ door. Think we finally found a company that will do this height with mirrored fronts. Mr. F&F and I have had several “door” meetings and I am SICK of doors and he likes to go over all the details A LOT and I just want to solve and move on. A little tension in the F&F household, perhaps?

This whole mess could have been avoided pre-drywall, had our door supplier been timely with his response (six weeks, really?), so we forged ahead based on our assumption that doors could be sourced. Bad idea. We have purchased all our windows and doors with this company over the years and they have generally been responsive, but this time, not so much. In retrospect, we should have hounded the supplier more and not gone ahead with drywall until we knew.

So this is one of those renovation slow-downs and cost upticks. I share this with you so we do the master bath reveal with honesty about the renovation process. Rare the renovation reveal where the homeowner says, “it was a piece of cake” or “a thoroughly enjoyable process.” Renovations are a pain, but hopefully the beautiful space makes it worthwhile.

 

Related Posts

  • Master Bath Renovation

    When we moved into this house ten years ago we did a serious cosmetic upfit…

  • Master Bath Renovation

    When we moved into this house ten years ago we did a serious cosmetic upfit…

Filed Under: Interior Design

« Summer Kick-Off Party
Big Crafty In Asheville »
10 Ways to Refresh Your Home for Free (or Almost Free)

More Good Tips!

Want to know Ten Ways to
Refresh Your Home for Free
(or Almost Free)?

Click here to find out

Trackbacks

  1. ...master bath reveal... | Form & Function says:
    March 11, 2013 at 10:39 pm

    […] about master bath renovation here and here and here.   We actually started using bath at end of August, but it’s taken awhile to get […]

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

CONTACT US

CONTACT US

Tell us about your project >>

ABOUT

ABOUT

Meet Carole

POPULAR POSTS

Picking the Right White Paint

Picking the Right White Paint

Best Interior Design Tips, Part 1

Best Interior Design Tips, Part 1

OUR FAVORITES

Decluttering Your Home: 43 Actionable Tips to Get Started

Decluttering Your Home: 43 Actionable Tips to Get Started

Bathroom Renovation Planning Guide

Bathroom Renovation Planning Guide
Form & Function – Asheville NC

305 Town Mountain Road
Asheville, NC 28804
Phone: 919-696-8141

Tell us about your project

Privacy Policy • Sitemap • Copyright 2022 Form & Function. All rights reserved. • Web Design by Glory & Brand